Image of a dog with K9 Kit Blog logo, representing expert advice and care tips for your furry friend.
Sale!

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

Original price was: £18.49.Current price is: £16.99.

Price: $18.49 - $16.99
(as of May 14, 2024 13:02:17 UTC – Details)

From the brand

lynxking dog lovers club

lynxking

A factory brand specializing in pet supplies with a professional team. We insist on using the best materials to make the best products.

lynxking snap leasheslynxking snap leashes

lynxking dog leasgh series

dog leash and collar

slip lead & check cord series

slip lead & check cord series

slip lead dog leash Braided

Dog Leash Webbing Lead

Check Cord Dog Leash Long

Dog Collar Soft Padded

Snap lead dog leash

Braided Dog Training Leash

Double Handle Dog Leash

dog collardog collar

dog collar for large dogsdog collar for large dogs

Is Discontinued By Manufacturer ‏ : ‎ No
Product Dimensions ‏ : ‎ 360 x 0.38 x 0.38 inches; 14.11 ounces
Date First Available ‏ : ‎ July 20, 2019
Manufacturer ‏ : ‎ Keenleader.,ltd.
ASIN ‏ : ‎ B07VJ8FYCD

SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose

Reviews

There are no reviews yet.

Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog”

Your email address will not be published. Required fields are marked *

Scroll to Top